The second step to repairing the road to the transfer station in McBride was completed on Wednesday July 14, 2021. Truckloads of gravel/dirt were spread and packed by crews. In order to keep the dust levels down, a non-hazardous calcium (non toxic & non rust causing) was added to the mixture. /ANDREA ARNOLDRelated Posts:Transfer station road gets some TLCNo turning lane for transfer stationExpanded hours for Valemount transfer stationNew Bins at the McBride DumpRepair on Airport Road underway in McBridePost navigationMike Wiegele remembered for his passion, drive and love of skiingWildfire west of Crystal Ridge balloons to 60ha